When the conversion
of a warehouse into a new fish-processing unit for Sealord (Europe) Ltd in Caistor,
Lincoln called for a robust, hygienic and easy to install drainage system, ACO
Fulbora Modular 2000 Channel Drainage was specified.
Topcon Construction Ltd first
excavated channels in the existing concrete floor before easily installing two
15m lengths of ACO Fulbora Modular 2000 channel drainage. Running through the busy preparation area, the new channels
were laid to a sloping invert of 100mm - 125mm for optimum efficiency.
Electropolished
ladder gratings were then installed to provide an anti-slip, bacterial-resistant
cover to the channels. Two high strength Super Industrial Eurogullies featuring
integral silt baskets, were also fitted at one end of each channel length to
ensure the efficient collection of solid waste.
Mark Tyrell from Topcon Construction
Ltd said: "We were able to piece together
the channel drainage from ACO Fulbora with ease and found it incredibly straightforward
to install." |